Ctrl Fre@k programmed the new 2010 December Rains on a Wholehog 3 console with a Hog3PC running as a backup.
Location: Theatre @ Esplanade, Theatres On The Bay
Involvement:
Wee – Lighting Programmer
Hog 3 and Hog 3 PC
[Ctrl Fre@k at 2010-10-3 ]
Tags: Lighting, Programming/Engineering, Theatre